PEONY
AMMONIA
Project
(KBR)
Freeport,
TX
Construction Planner
/Scheduler
Present
· Providing
scheduling expertise for construction of an Ammonia Plat & Terminal
· Analyzing
baseline and evaluating them for logic, duration & feasibility.
· Monitor
and evaluate status progress against baseline schedule.
· Reconcile
labor, equipment and materials for total EPC project
Bayway
Refinery Chemours
(KBR)
Linden, NJ
TAR Planner
/Scheduler
April 2015 - November 2015
· Providing
scheduling expertise for Refinery TAR and maintenance using Oracle P6 ver15.1
· Developing
baseline and coordinating activities with maintenance for 6 week shutdown.
· Monitor
and status progress against baseline schedule.
· Estimate
and reconcile labor, equipment and materials for total ETC
L. Pouncey Jr (P2.
USMC (NAVFAC) (Aerotek)Camp
Lejeune, Jacksonville, NC
Program Planner
/SchedulerMarch2014 - September 2014
· Provided
scheduling expertise for USMC (NAVFAC) Camp Lejeune, Jacksonville, NC using
Primavera, Oracle P6 software to verify and validate schedules
· Evaluate
& check for compliance, approved baseline,
· Monitored
and check field progress against baseline schedule.
USMC (FRF) (Onyx Group)Okinawa,
Japan
Project Planner
May 2012 - May 2013
· Provided scheduling
expertise for USMC (FRF) Okinawa, Japan (Onyx Group) project using Primavera,
Oracle software to verify and validate schedules
· Managed
DPRI Divisional schedules and incorporating them into an Enterprise Master
Schedule while developing WBS and activity codes that has significance to
various projects and overall program
State
DepartmentBaghdad, Iraq
Scheduling
Analyst Mar 2011 - September 2011
· Provided
scheduling expertise for OBO (State Department) Construction projects in Iraq
using Primavera software to verify and validate schedules
Shaw
Air Force Base (Harrington Group)Sumter, SC
Engineering
Technician-NAVFAC June 2010 – Feb
2011
· Effectively
insured that Quality Assurance and Safety are achieved to the standards
of EM 385 and OSHA 1926 through inspections in the construction
of facilities at Shaw Air Force Base
· Noted and
reviewed request for changes to schedules and approve pay request
Motley
Construction CompanyLatta, SC
Manager of projectsJune 2009
- May 2010
· All
managerial duties as relates to residential and commercial construction
Dillon County School DistrictAugust2008 – June
2009
High
School InstructorDillon, SC
· Taught
high school students the basic elements of carpentry and how it fits in
building construction
Pegasus
Construction CompanyOctober 2007 - January 2008
Project
Planner SchedulerAurora, NC
· Sulfate
mine expansion scheduling and monitoring progress of subcontractors to the
agreed on base line
Domtar
PaperApril 2007 – September 2007
Maintenance
Technician Bennettsville, SC
· Provided
necessary duties that ensured continuous operation of identified processes
and equipment
Kellogg
Brown & Root
January 2006 – March 2007
Project
Planner Scheduler (Military Contractor- DOD) Diwahniya, Iraq
· Scheduled
construction activities for work identified as military construction or
rebuild
CB
& A Project ManagementJuly 2005 – November 2005
Project
Planner SchedulerBirmingham, AL
· Scheduled
construction activities for expansion of a boiler upgrade @ chemical plant.
Anvil
SportswearJuly 2003 – June 2004
Maintenance
Technician Dillon, SC
· Provided
necessary duties that ensured continuous operation at a shipping and
receiving facility
Al
Hill Enterprises Inc.November 2002 – April 2003
Project
Engineer Miami, FL
· Performed
all managerial aspects of small mechanical projects in accordance to Dade
County Mechanical Codes
L. Pouncey Jr (P3)
Austin
IndustriesSeptember 2002 - November 2002
Area
Planner: Airport Expansion for Miami Int’l AirportMiami, FL
· Scheduled
construction activities from construction managers’ viewpoint
FLUOR
DANIEL
ProjectsAug 1979 – April 2001
Project
Planner - Pharmaceutical Expansion Eli Lilly (2001 – 2002)Indianapolis, IN
·
Prepared and created baseline schedule from approved
estimate, man loaded schedule, monitored construction activities and tracked
subcontractors’ progress against baseline
Project Planner - Bio-Gen
Pharmaceutical Facility (2000-2001)Raleigh,
NC
·
Scheduled and monitored construction activities for
expansion of existing pharmaceutical facility
Project Planner – Bio Tech Expansion
NOVARTIS (1998-1999)Raleigh, NC
·
Scheduled construction activities for expansion, building
and process
Area Planner - Pulp & Paper for
Proctor & Gamble (1997-1998)Cape
Girardeau, MO
·
Scheduled installation of tissue & towel buildings and
processes and make adjustments according to approved change orders
Lead Area Planner - Pulp & Paper
for Proctor & Gamble (1997-1998)Albany,
GA
·
Lead scheduler, tissue and towel specific monitor and
progress schedule against baseline schedule
Project Planner: Analog Devices (1993-1995) Cavite,
Philippines
·
Overall program scheduling and subcontractor schedule and
progress verification
Lead Area Planner: Copper Mine
Expansion (1992-1993)Irian Jaya,
Indonesia
· Provide
EPC scheduling as required for grass roots project, lead scheduler for a
diesel generator power plant
Project Controls Engineer: DuPont
Delta Division (1991-1992)Greenville,
SC
· Provide
project controls office support as required for project construction team
Project Planner:
Aramco Service Co., Offshore Development (1990-1991)Dhahran, Saudi Arabia
· EPC
scheduling for de mothballing GOSP into production.
Area Planner: Recycle Fiber for
Bowater/Southern Division
(1989-1990)Calhoun, TN
· Scheduled
construction activities for installing recycle process at existing mill
Lead Area Planner: Paper Mill
Expansion - Union Camp Co. (1989)Eastover,
SC
· Scheduled
construction activities for expansion of existing mill
Project Controls Engineer: Phenol
Expansion - General Electric Plastics (88-89)Mt.
Vernon, IN
· Scheduled
construction activities for construction shutdown, w/ FINEST HOUR
Project Controls Engineer: Increase
Capacity Upgrade-DuPont-Delta Division
(88)Greenville, SC
· Provided
project control duties for several DuPont
plants
Division Planner:
Northern Area Development (1981)Aramco,
Saudi Arabia
· Planned
and scheduled activities for installation of a quay wall and marine
facility
Area Planner: Paper Mill Phase I,
Weyerhaeuser Paper Company
(1980-1981)Columbus, MS
·
Scheduled construction activities for the wood yard as it
related to the overall mill
Area Civil Engineer: P&G Paper
Mill Oglethorpe Paper Mill (1979-1980)
Oglethorpe, Ga
·
Area assignment at, civil duties as they related to site
development of grass roots plant.
Area Civil Engineer: SNUPPS Callaway
Nuclear Power Plant (1978-1979)Fulton,
Mo
·
Area assignment, Civil duties related to the Diesel Gen.
and Fuel Storage Bldgs.